What "done" means

A design is not finished until it can be manufactured, certified and serviced

Every development programme ends with an engineering pack that a production planner can execute: frozen bill of materials with approved vendor lists, tested firmware images with checksums, assembly drawings, test sequences, fixture definitions and a certification plan with named test scopes.

Because industrialisation happens in the same organisation, DFM and DFT findings arrive while the design is still open — not after tooling is cut. It is the single biggest reason our products reach certified shipment inside six months.

40+

Engineers

6

Design disciplines

100%

Designs handed with DFM review

Capabilities

Six engineering disciplines, one accountable team

Engage us for the whole product or for a single discipline that has to plug into your existing design.

Electronics & power design

Analogue and switched-mode power stages, magnetics design, constant-current driver topologies, protection circuits, 4-layer PCB layout with DFM rules applied at layout time, not after.

Embedded firmware & protocol stacks

Bare-metal and RTOS firmware, bootloaders and signed updates, DALI-2 DT6/DT8 device stacks, cellular and GNSS drivers, BLE, low-power state machines, factory provisioning and checksum gating.

Mechanical & industrial design

Enclosure architecture, thermal paths, sealing and IP-rated potting or conformal coating options, cable glands and strain relief, sheet-metal and plastic parts with tooling reviews and tolerance studies.

Apps, cloud & fleet services

iOS and Android applications, device APIs, provisioning and identity, telemetry ingestion, remote configuration, fleet health dashboards and integration to a customer's PIM, ERP or BI stack.

Test engineering & automation

End-of-line test sequences written as automated scripts on real fixtures: hi-pot, power accuracy, protocol communication, dimming curves, colour points, RF and GNSS smoke tests, leak correlation and burn-in policy.

Compliance & certification engineering

Pre-compliance testing in-house, submission packages for protocol and safety certification, radio and telecom pathway screening, battery and packaging responsibility scopes, labelling review before first sale.

Engagement

Four gates from brief to build-ready

Each gate closes with written evidence. Nothing moves forward on a verbal "looks fine".

Gate 1 · Requirements

Scope freeze

  • Use case, target environment, warranty terms
  • Regulatory and certification scope per SKU
  • Interface and interoperability matrix
  • Product requirement document signed

Gate 2 · Design

Architecture review

  • Block diagram, power budget, thermal model
  • Firmware architecture and memory map
  • Mechanical stack-up and sealing strategy
  • Long-lead and single-source parts flagged

Gate 3 · Prototype

Working units

  • Prototype builds on production-intent PCBs
  • Interoperability proven on a real network
  • Internal pre-compliance sweep
  • DFM and DFT findings closed out

Gate 4 · Release

Engineering pack

  • Frozen BOM, approved vendor list, drawings
  • SOPs, jigs, fixtures and test sequences
  • Certification plan and submission package
  • Handover to pilot build
Engineering test bench with protocol test rigs

What you receive

The deliverables, itemised

  • Schematic and PCB package — source files, gerbers, stencils, assembly drawings, test points declared.
  • Firmware release set — versioned images, checksum manifest, provisioning tooling, debug symbols retained.
  • Protocol evidence — interoperability results across reference controllers and third-party devices.
  • Mechanical package — 3D models, 2D toleranced drawings, sealing and torque specifications, tooling drawings.
  • Process package — station-level SOPs, jig and fixture definitions, workmanship standard references.
  • Test package — end-of-line sequences, limits, fixture designs, burn-in policy and re-test rules.
  • Certification package — submission files, sample quantities, lab bookings and a compliance matrix.

Questions

Commonly asked about development work

Yes. A common entry point is a completed design that has never been through a production review. We audit the schematic, layout, bill of materials and firmware, then deliver a DFM and DFT report with a costed list of changes needed to make it buildable, testable and certifiable. Where a design is already complete, we go straight to industrialisation.
Ownership follows the engagement: design-for-hire work transfers to the customer on final payment, including schematics, firmware source, mechanical models and tooling. Where Saiga Electronics contributes pre-existing platform IP — protocol stacks, reference power stages, test automation — the customer receives a perpetual licence to use it in the delivered product. Both positions are set in writing before work starts.
Firmware is checksum-gated at flashing and the version is recorded against every serial. Component changes go through an engineering-change lock: no substitution enters the bill of materials without a documented impact assessment and a re-test of the affected scope. A fielded batch therefore stays traceable to the exact build that produced it.
That is our preferred model. A single platform with power classes, interface options and enclosure variants shares one line, one test philosophy and one certification plan — the DALI-2 driver family spans five wattage classes on the same assembly flow. Multi-SKU changeover is labour hours and fixture swaps, not a re-launch.
A two to four week feasibility review: requirement clarification, regulatory pathway screening, a bill-of-materials and interoperability risk list, and a build plan with gates. It ends with a go or no-go decision made on evidence, before any tooling or long-lead commitment is placed.

Bring us the idea, the schematic, or the prototype

Send the requirement sheet and we will come back with a gated development plan, a certification path and a production timeline.